ALFA MOUNT GROUP
Alfa Mount Sdn. Bhd. was incorporated in 8th February 2001. The company is principally involved in civil engineering works, building and road construction works, pipe works, mechanical & electrical works, sewerage works, maintenance and operation of sewage treatment plants, which are on par with the government's mission to develop Malaysia. Alfa Mount Sdn. Bhd has actively participated in various contract works, both private and government.
With the determination to become a competitive, respectable, and successful construction company, Alfa Mount Sdn. Bhd has implemented various strategies to realize that vision. One of these strategies are the recruitment of caliber, capable and experienced personal in the construction industry.
Alfa Mount Sdn. Bhd. is registered Pusat Khidmat kontraktor Kelas A bertaraf Bumiputera and "Lembaga Pembangunan Industri Pembinaan Malaysia Gred 07" and "Unit Pendaftaran Kontraktor dan Juruperunding Kelas A bertaraf Bumiputera" contractor. With these certifications, Alfa Mount Sdn. Bhd is eligible to participate in construction projects from Government and private sector.
Vision
To be the leading construction company in Malaysia, renowned for excellence, integrity, and innovation in delivering sustainable infrastructure solutions that enhance the nation's development.
Mission
Our mission is to contribute significantly to the growth and advancement of Malaysia's infrastructure by consistently delivering high-quality civil engineering, construction, and maintenance services.
Values
We are dedicated to achieving excellence in everything we do, from project execution to client service, by maintaining the highest standards of quality, professionalism, and innovation.
COMPANY VEHICLES & MACHINERY
Backhoe Loader / Excavator
Quantity = 14Lori Rigid / Dumper Tipper
Quantity = 9Road Paver
Quantity = 3Bulldozer
Quantity = 1Compactor Roller
Quantity = 3Tandem Roller
Quantity = 2Pneumatic Roller
Quantity = 1Prime Mover
Quantity = 14x4 Pick Up Double Cab
Quantity = 14Concrete Mixer 1.5 Ton
Quantity = 4Generator 20 KVA
Quantity = 2Portable Cabin Container 20 Feet
Quantity = 3Power Broom
Quantity = 1Self Loader
Quantity = 1Traktor Pertanian Kobuta
Quantity = 1Portable Cabin Container 20 Feet
Quantity = 3COMPLETED PROJECTS
PROPOSED UPGRADING AND PAVEMENT IMPROVEMENT / REHABILITATION WORKS ALONG THE EISTING COASTAL ROAD PACKAGE PA-4 KAMPUNG SUNGAI BULOH / SEBUYAU COASTAL ROAD- SECTION 1 (Q20171)
MENAIKTARAF JALAN LINGGA/STUMBIN/SRI AMAN (FASA II), SARAWAK (SUB CONTRACT WORKS)
PROJEK MEMBINA DAN MENYIAPKAN BEKALAN AIR LUAR BANDAR (BALB) SAMBUNGAN BEKALAN AIR KE KAWASAN TEBEDU, BAHAGIAN SAMARAHAN (SUB CONTRACT WORKS FOR HIGH LEVEL TANK 20.2 AND PIPELINE K
MENAIKTARAF JALAN LINGGA/STUMBIN/SRI AMAN (FASA I), SARAWAK (SUB CONTRACT WORKS)
MENAIKTARAF JALAN SK PELUGAU, BAHAGIAN SIBU
MENAIKTARAF JALAN KEMENA, ULU BALINGIAN, BAHAGIAN SIBU
CONSTRUCT PARKING SPACE ASPHALT PAVEMENT BESIDE GUARD HOUSE AT BINTULU INTEGRATED FACILITY
Current Project
Company Project Experience (Current Project)
NO | NAME OF PROJECT | CLIENT | DATE START | COMPLETION DATE | CONTRACT AMOUNT (RM) |
1 | Cadangan Perpindahan Dan Pembinaan Semula Bagi Sk Penasu, Daro Mukah. | Jabatan Kerja Raya (JKR) | 06.09.2022 | 05.09.2024 EOT Until 21.09.2024 | 37,000,000.00 |
2 | Proposed Upgrading and Pavement Improvement/Rehabilitation Works Along The Existing Coastal Roads Package PB-5 Daro/Tanjung Jol/Matu Daro(Q2024), From KM 8+600 To KM 19+900 By Using Road Base Stabilization Treatment Technology, Mukah Division, Sarawak. | Jabatan Kerja Raya (JKR) | 30.08.2022 | 29.08.2023 | 22,728,332.00 |
3 | Proposed Upgrading And Pavement/Rehabilitation Works Along The Existing Coastal Roads Package PB-10A (I) Batang Baligian Bridge Approach Road (Q2021), From KM0+000 To KM5+798.19 (II) Baligian - Kuala Baligian Road (Q2020), From KM2+100 To KM13+724.779 | Jabatan Kerja Raya (JKR) | 05.07.2023 | 04.07.2024 | 20,468,293.00 |
4 | Proposed Upgrading And Pavement Improvement/Rehabilitation Works Along The Existing Coastal Roads Package PB-4A Jepak To Kuala Tatau Road (Q487) i) From KM12+600 To KM18+454 ii) From KM22+398 To KM28+660 iii) Kuala Tatau Bridge Junction Improvement, Bintulu Division, Sarawak. | Jabatan Kerja Raya (JKR) | 31.03.2022 | 30.06.2023 EOT Until 21.12.2023 | 18,000,000.00 |
5 | Proposed Upgrading and Pavement Improvement/ Rehabilitation Works Along The Existing Coastal Roads Package PA-7 (Phase 4): Persisiran Triso/Melebu/Pusa Road (Q2002) From KM0+000 To KM9+100, Betong Division. | Jabatan Kerja Raya (JKR) | 26.01.2022 | 25.01.2023 EOT Until 22.09.2023 | 13,000,000.00 |
6 | Proposed Upgrading and Pavement improvement/Rehabilitation Works Along The Existing Coastal Roads Package PB-4C Tanjong Kidurong/Kuala Suai/ Kuala Niah/ Kuala Sibuti/ Bakam Road (Q2007-1), From KM59+825 To KM65+930, Bintulu Division, Sarawak. | Jabatan Kerja Raya (JKR) | 31.03.2022 | 30.06.2023 EOT Until 10.12.2023 | 8,993,800.00 |
7 | Pembinaan Jalan Raya Di Kampung Seberang Bawang Matu (KG.Hilir Bawang Dan KG.Hulu Bawang). | Jabatan Kerja Raya (JKR) | 05.07.2022 | 14.07.2024 EOT Until 04.08.2024 | 10,200,000.00 |
8 | Proposed Education Block, Administration Block & Single Storey Semi Detached House On Lot 684, Block 225, KNLD, Jalan Batu Kawa, Kuching, Sarawak. | ST Basil's Church | 19.02.2022 | 18.08.2024 | 6,212,726.50 |
Previous Project
Company Project Experience (Previous Project)
NO | NAME OF PROJECT | CLIENT | COMPLETION DATE | CONTRACT AMOUNT (RM) | 1 | Projek Membina dan Menyiapkan Bekalan Air Luar Bandar (BALB)- sambungan Bekalan Air ke Kawasan Tebedu, Bahagian Samarahan, Sarawak.Kontrak No.KKLW/BALB/07/2011 ( Sub.Contract Works for High Level Tank No.2 and Pipeline K) Main Con: Impian Zaman Sdn Bhd | KKLW | 24.09.2013 | 4,880,894.00 | 2 | Cadangan Projek Taman Awam Muhibbah Tawau, Sabah (Sub Contract works) | Jabatan Landskap Negara | 31.07.2010 | 2,340,000.00 | 3 | Nominated Sub-Contractor For Mechanical and Electrical works For Proposed Sg.Sebalak Padi Irrigation Scheme, Betong Division, Sarawak (Package A). (Sub Contract works) | DID | 06.12.2010 | 3,500,000.00 | 4 | Menaiktaraf Jalan Sk Pelugau, Bahagian Sibu.Contract No. PWD/HO/B100/2010 | Jabatan Kerja Raya (JKR), kuching | 31.01.2011 | 2,050,000.00 | 5 | Menaiktaraf Jalan Kemena, Ulu Balingian, Bahagian Sibu, Sarawak. (Contract No. PWD/HO/B099/2010) | Jabatan Kerja Raya (JKR), Kuching | 04.12.2010 | 3,300,000.00 | 6 | Rancangan Tebatan Banjir Di Sungai Gersik, Kuching. (Sub-Contract works) | DBKU | 29.03.2011 | 3,400,000.00 | 7 | Menaiktaraf laIan SRI AMAN/SEMBAU/STUMBIN/LINGGA, BAHAGIAN SRI AMAN, SARAWAK. (Sub-Contract Works) Main Con: Impian Zaman Sdn Bhd | Jabatan Kerja Raya (JKR), Kuching | 23.06.2013 | 38,488,000.00 | 8 | Menaiktaraf Jalan Kemena, Ulu Balingian, Bahagian Sibu, Sarawak. (Contract No. PWD/HO/B099/2010) | Jabatan Kerja Raya (JKR), Kuching | 04.12.2010 | 3,300,000.00 | 9 | Menaiktaraf Jalan Kemena, Ulu Balingian, Bahagian Sibu, Sarawak. (Contract No. PWD/HO/B099/2010) | Jabatan Kerja Raya (JKR), Kuching | 04.12.2010 | 3,300,000.00 | 10 | Proposed Upgrading And Pavement Improvement/ Rehabilitation Works Along The Existing Coastal Road Package PA-4- Kampung Sg.Buloh/Sebuyau Coastal Road-Section 1 (Q2017-1)From 0+100 To KM 9+650,Samarahan Division (Sub-Cont Works) Main-Con: KACC Construction Sdn. Bhd. | Jabatan Kerja Raya (JKR), Kuching | 30.03.2021 | 10,521,398.20 | 11 | Repairing Works For Damage Sewerline And Associated Works At RPR Kidurong Behind Lot 3383 & 3407 (Phase 3) Bintulu Bintulu Development Authority | Jabatan Kerja Raya (JKR), Kuching | 31.05.2021 | 154,460.00 |
LICENSES & CERTIFICATIONS
Contact Us
Our Address
No. 203, 1st Floor, Lot 1335, Greenville Park Shophouses
Jalan Batu Kitang, 93250, Kuching, Sarawak.
Email Us
corporate@alfamountgroup.com
Call / Fax to Us
T: +60 82 - 545428
F: +60 82 - 451005